stc signed weifang project phase ii sncr system-凯时k66

time:2017-04-12

the msw treatment capacityof weifang project is 2x500t/d for phase i and 1x500t/d for phase ii, i.e.1500t/d in total. this contract is based on the phase ii of weifang project. onesncr denitration system is allocated for phase ii, while the common part isshared with the sncr system for phase i. this sncr system can adapt to the fluegas volume change within 50~100% of rated volume and the flue gas temperaturechange with ±50℃. based on the volume and components of flue gas, thesncr denitration system is able to adjust automatically in order to guaranteethat the emission index is always below the limit.

网站地图